FEATURES:
- Designed for use with Ar-CO2 mixed shielding gas
- General Fabrication
- Ideal for general structural fabrication, mining and shipbuilding.
- Out of position welding possible
| Estimated Lead Time: | 3-5 days |
| Inner Qty: | 1 |
FEATURES:
- Designed for use with Ar-CO2 mixed shielding gas
- General Fabrication
- Ideal for general structural fabrication, mining and shipbuilding.
- Out of position welding possible
| Estimated Lead Time: | 3-5 days |
| Inner Qty: | 1 |